Miss Selfridge

Gently Used STANCOR P-8416 Long Leads Hi-Pot Verified GOOD **SHARED SHIPPING* $3

Description: Gently Used STANCOR P-8416 Long Leads Hi-Pot Verified GOOD 125-0-125 @ 25mA 6.3@1.0A This transformer had an easy life. Removed from a home brewed transistor tester oscilloscope curve tracer. The 6.3 Vac leads were never used they were uncut and taped off. They original builder left all leads long. Used in a piece of test gear, it had very little powered on time. Most of its previous life was spent sitting on the shelf. Shipping can cost up to $18. So... **SHARED SHIPPING* $4 ##BE AWARE THERES A LISTING FOR A PS-8416 THAT IS ACTUALLY A PS-8415, LOWER VA RATED##

Price: 38.5 USD

Location: Richland, Washington

End Time: 2024-10-15T18:20:57.000Z

Shipping Cost: 4 USD

Product Images

Gently Used STANCOR P-8416 Long Leads Hi-Pot Verified GOOD **SHARED SHIPPING* $3Gently Used STANCOR P-8416 Long Leads Hi-Pot Verified GOOD **SHARED SHIPPING* $3Gently Used STANCOR P-8416 Long Leads Hi-Pot Verified GOOD **SHARED SHIPPING* $3Gently Used STANCOR P-8416 Long Leads Hi-Pot Verified GOOD **SHARED SHIPPING* $3Gently Used STANCOR P-8416 Long Leads Hi-Pot Verified GOOD **SHARED SHIPPING* $3

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: STANCOR

Model: PS-8416

MPN: PS-8416

Country/Region of Manufacture: United States

Recommended

Stancor filter choke C-1002 made in Chicago USA, untested
Stancor filter choke C-1002 made in Chicago USA, untested

$12.99

View Details
Vintage Stancor Transformer # 823P1
Vintage Stancor Transformer # 823P1

$12.00

View Details
STANCOR C-1003 Choke NOS w/orig. carton! Test OK!
STANCOR C-1003 Choke NOS w/orig. carton! Test OK!

$29.99

View Details
Two (2) Stancor Filter Chokes, C1420, 350 ohm 0.080 MA Tube Amplifier
Two (2) Stancor Filter Chokes, C1420, 350 ohm 0.080 MA Tube Amplifier

$50.00

View Details
Stancor PC-8410 Power Transformer Clean! Tested! Works! 5V, 6.3V, 360-0-360 Vct
Stancor PC-8410 Power Transformer Clean! Tested! Works! 5V, 6.3V, 360-0-360 Vct

$79.99

View Details
Pair: Stancor A-53 Interstage Transformers, NOS, In original boxes
Pair: Stancor A-53 Interstage Transformers, NOS, In original boxes

$69.95

View Details
Vintage Stancor P-6134 FILAMENT TRANSFORMER
Vintage Stancor P-6134 FILAMENT TRANSFORMER

$18.60

View Details
Vintage Chicago Stancor ? Tube  Transformer Model F-63
Vintage Chicago Stancor ? Tube Transformer Model F-63

$19.95

View Details
Stancor A-8106 Transformer A8106
Stancor A-8106 Transformer A8106

$58.77

View Details
Stancor PS-8416 Power Transformer 117v-ac 125v-ac
Stancor PS-8416 Power Transformer 117v-ac 125v-ac

$45.02

View Details